Poland’s public charging register listed 135 locations with at least one DC point rated 400 kW or higher in the EvCompass reading of 26 November 2026, a rapid increase from earlier readings this year. Since 1 October 2026 EvCompass found a first 400 kW point at 52 locations, of which 40 were entirely new locations entered into the register during that period.

Rapid roll‑out in numbers

EvCompass’s 26 November snapshot shows 135 active Polish locations with a declared DC connector power of ≥400 kW in the national EIPA register. The pace of additions rose sharply in recent months: 68 locations were already recorded at the service’s first reading on 22 July 2026, 120 by the end of October and 135 by the 26 November reading. EvCompass treats a “first point in the register” as the date it was first seen in EIPA.

The operator breakdown in EvCompass’s 26 November reading shows GreenWay with 61 locations, MOYA (Anwim S.A.) with 36, Shell Recharge with five, ORLEN with 16 and smaller operators making up the remainder. Of the 52 locations where a first 400 kW point was recorded since 1 October, GreenWay accounted for 25 and MOYA 17. EvCompass also recorded a correction on 26 November to the new‑location count after adjusting register identifiers.

Operator race and prices

Declared one‑off prices at the 400 kW points EvCompass surveyed range from PLN 1.99 to PLN 3.90/kWh, with a median of PLN 2.82/kWh — higher than October’s national DC median of PLN 2.52/kWh, the data show. GreenWay’s public price lists (effective 15 October 2026) and operator tariffs are reflected in the EvCompass reading.

Large network operators have published aggressive build plans this year: Shell Poland said earlier in 2026 it planned to open 25 new high‑power locations in 2026 (50 charging points) as part of a broader roll‑out, and its early openings already include Poznań, Białystok and Marki. Meanwhile MOYA (Anwim) has been expanding fast: the group says it has opened dozens of fast‑charging locations and is targeting many more ultrafast sites before the end of the year.

What this means for the market

The rapid increase in declared 400 kW points tightens the ultrafast charging network along Poland’s motorways and major routes, shortening charging stops for long‑distance BEV users and supporting emerging electric heavy‑truck corridors where megawatt‑class charging (MCS) will be needed. Operators’ build plans and the EIPA register updates make Poland one of the European leaders in adding very‑high‑power public points in late 2026.

For fleets and OEMs operating in Central and Eastern Europe the practical effects are twofold: journey times on trunk routes fall as more hubs appear, and competition between network operators may produce significant local price variation — EvCompass’s data show one‑off rates clustered around PLN 2.82/kWh but spanning almost twofold at some locations. That spread will shape route planning and total cost of ownership calculations for companies moving to electrified fleets.

Poland’s EIPA remains the official public register for charging infrastructure data; operators submit station coordinates, declared power and prices to the registry, which is the source used by market trackers such as EvCompass to measure roll‑out. Policymakers and buyers will watch whether declared connector power translates into sustained delivered charging speeds as sites move from registration into full commercial operation.

Electric vehicles listings on WorldTrader24 →

Sources: EvCompass, EIPA (Urząd Dozoru Technicznego), GreenWay, Shell Polska, Anwim (MOYA)