Volkswagen and Chinese battery maker Gotion High‑Tech have formally notified Morocco’s Competition Council of a package of three interdependent joint ventures: a cathode‑materials (CAM) plant in Kenitra, Morocco, and two battery‑cell factories in Valencia (Spain) and Šurany (Slovakia). The council publication — dated 12 November 2026 — makes the notification public and opens a ten‑day consultation window that runs to 23 November 2026.

Project scale and roles

According to the notification summary and reporting from the region, the Moroccan JV (to be created by Gotion Power Africa S.A.S. with a 51% Gotion / 49% PowerCo ownership) will produce cathode active material for LFP cells; that material is intended to be shipped to PowerCo’s planned Valencia cell plant and to a new Gotion‑run cell site at Šurany in Slovakia. The transaction documents describe the three ventures as a single, conditional project: none proceeds without the others.

Publishers covering the filing put combined headline figures on the programme: an announced total industrial investment of roughly €3.2–€5.8 billion (depending on currency conversion and scope reported), an initial aggregated European cell capacity of about 60 GWh (with expansion plans to 100 GWh), and a Kenitra cathode plant capacity shown in filings as c.100,000 tonnes of LFP cathode material or earlier project documentation citing 20–29 GWh‑equivalent phases. The Morocco filing itself states the regulatory notice was made public on 12 November 2026.

Local economics and state support

Reporting notes the partners expect public support: Spain has already channelled grants and loans through the PERTE VEC programme to the Valencia PowerCo project, and Slovakia previously approved roughly €214m of aid for Šurany. The partners say Kenitra’s advantages include Morocco’s large phosphate reserves (used in LFP chemistries) and proximity to Atlantic ports such as Tanger Med. The Moroccan Competition Council’s summary and subsequent local coverage highlight that the three JVs were notified to Moroccan authorities on 12 November 2026 and that the public consultation in Morocco closes on 23 November 2026.

What this means for the market

For Central and Eastern Europe the most immediate impact is the Šurany link: if approved and built to plan, Šurany would add LFP‑cell manufacturing capacity in Slovakia that is explicitly designed to feed European carmakers with lower‑cost LFP chemistries used in entry and mid‑range BEVs. That widens Europe’s domestic LFP footprint and could change sourcing dynamics for assembly plants in the region — but the Competition Council filing makes clear the three projects are conditional on one another, so the timetable and final scope remain subject to regulatory clearance and successful closing of all three ventures.

The notification is a strategic shift: Volkswagen’s direct stake in the Moroccan JV and its existing shareholding in Gotion create a vertically linked supply chain spanning raw materials processing in Morocco to cell production in Spain and Slovakia. Policymakers, suppliers and local service firms will watch the consultation and approval process closely over the coming weeks.

VW electric vehicles on WorldTrader24 →

Sources: Morocco Competition Council, Industrie Du Maroc